24 November 2014

Tried and Tested

Before every uninterruptible power supply (UPS system) shipment leaves the Cetronic warehouse, where possible, we charge the batteries, put the UPS system through a load test, check the manual bypass and static bypasses are working, as well as doing a battery test. This is done to make sure the UPS system is functioning correctly, before shipping the unit to you.

If any accessories have been ordered with the UPS System, such as an SNMP card, we will check that the accessory is communicating with the UPS System properly, usually through computer software.

We are able to modify UPS systems to suit your need. For example, on our smaller range of UPS systems, which typically have an IEC plug socket, we can modify these to have hardwired input and output terminals. Generally, to do this we would mount a plastic box on the back of the unit, and fit terminals inside the plastic box for the input and output. We would then do thorough tests to make sure the connections are safe and working.

Unit 5, Optima Business Park
Pindar Road
Hoddesdon
Hertfordshire
EN11 0DY UK

Tel: 01920 871077
e-mail: sales@cetronicpower.com

Cetronic is an ISO9001:2015 Certified Company.
Registered in England 04458917

Privacy and Cookies

Riello Authorised Reseller 2023Riello Service Partner 2023
Top crossmenu linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram